Get the enzyme strategy right before you build
Planning a new bio-conversion facility? The most expensive enzyme mistakes happen in the design phase — when generic systems get locked into large-scale infrastructure.

Biology before infrastructure
We integrate enzyme and production concepts into new projects early
Biomass assessment and enzyme design
Green-Field integrates specific enzyme and production concepts early in new bio-conversion projects. We assess your biomass targets, design an enzyme strategy, and provide technical and economic feasibility input — all before major capital commitments are made.
Systems architecture from day one
Our role is biology systems architect. We work alongside your engineering partners and plant designers to ensure the biological process is optimized from the start — not retrofitted later at three times the cost.
We focus on your profit from the start
Enzyme strategy locked in early means capital efficiency. Locked in late means retrofitting at triple the cost — or walking away from revenue streams you never planned for.

With Twogee
Structural mistakes avoided before infrastructure gets built.
Without Twogee
Generic systems lock in high follow-up costs and missed revenue.

Avoid high follow-up costs from generic, inefficient systems — or missed revenue from 2G sugar and synthetic biology products that were never planned for.
Built to perform
Four core strengths that move the needle
Tailored enzyme formulations
Designed precisely for your biomass and process
Seamless plant integration
Fits into your existing setup without disruption
In-house enzyme production
Make your own enzymes under license at your plant or let us recommend a suitable third party supplier for your unique enzyme cocktail
Predictive and proven scalability
We miniaturize, test, and validate before you scale. Years of industrial deployments mean our predictive models are built on real-world data — not assumptions.
Ready to move forward
We work with your team to build the right biology into your facility design
